Feb 2024 to now
Rotterdam
Tidemark Energy
Principal engineer
I own the electrical and controls design for two battery sites and sign off every energisation plan. I lead eleven engineers across design, commissioning and grid compliance.
PowerFactory
PSCAD
Grid-forming inverters
Vendor management
Results
Energised a 400 MWh site
11 days early
Own design and commissioning for 450 MWh across two sites.
Built and lead a team of eleven engineers.
Passed grid operator compliance at the first attempt on both sites.